Lorem ipsum dolor sit amet consectetur adipisicing elit. Quo magni quis illum iste, omnis sapiente, voluptatum tempora id culpa exercitationem sint sequi officia labore inventore corporis consequuntur dolor numquam, ea cupiditate ipsa dignissimos nostrum. Laboriosam voluptatem qui assumenda nostrum nesciunt, illum iste id nulla unde facilis, explicabo officia. Quae, officia.

SPAM Ir. H. Djuanda/Jatiluhur II

Nilai Investasi Rp 0
Nilai Konstruksi Rp 0
30.00 % Equity
70.00 % Debt

Penanggung Jawab

PJPK Menteri PUPR

Struktur Kontrak

Design Build Finance Operational Maintenance Transfer (DBFOMT)

Dukungan dan Jaminan Pemerintah

For Unsolicited Project, the project initiator will get a benefit to choose the compensation (additional 10% point on the procurement score, right to match, or purchasing initiative ideas by GCA).

Skema Pengembalian Investasi

User Charge

Keterangan

SPAM Ir. H. Djuanda/Jatiluhur II
PICK SPAM

Deskripsi

Ir. H. Djuanda/Jatiluhur II Regional Water Supply is a drinking water facility with 7.000 L/det out flow generated. Water allocation from this water supply is for Bekasi Regency (1.371 L/det), Bekasi City (1.051 L/det), DKI Jakarta (2.054 L/det) and Bogor Regency (2.012 L/det). 

Business Entity’s Socpe

-   Upstream scope: design, build, finance, operate, maintain, and at the end of the cooperation period hand over all the facilities that have been built to the upstream phase GCA. The Upstream Scope is carried out through a Design, Build, Finance, Operate, Maintain, and Transfer (DBFOMT) Contract.

Upstream technical scope:  Intake, Water Treatment Plant (WTP), WTP Reservoir, Distribution Pipe for Raw Water, and Distribution Pipe for Bulk Drinking Water.

-  Downstream scope: design, build, finance, improve distribution networks, provide new connections, maintain, and at the end of the cooperation period, the SPV will hand over all the facilities that have been built to the downstream phase GCA. The downstream scope is carried out through Performance-Based Contracts and Trade Credit Contracts.

Downstream technical scope:  Distribution Reservoir, Main Distribution Network Pipeline, and Distribution Pipe.

-  Project was initially proposed by Consortium PT Varsa Zamindo Lestari dan Ranhill Capital Sdb Bhd. The proposal was returned due to non-compliance with the preferred water tariff offtaker and financial capacity requirements, The government is now working to convert the project into a solicited scheme.

Kelayakan Ekonomi

EIRR 0 %
ENPV 0
BCR 0

Kelayakan Finansial

FIRR 0 %
FNPV 0
WACC 0 %

Readiness Criteria

PPP Book
FS
Basic Design
AMDAL
LARAP
KA Andal
DPPT
Usulan Penlok
Dokumen Pengadaan BUP

Menambahkan Review

Rating:

Review Proyek

Leslie Alexander

March 20, 2023 at 2:37 pm

Phasellus eget fermentum mauris. Suspendisse nec dignissim nulla. Integer non quam commodo, scelerisque felis id, eleifend turpis. Phasellus in nulla quis erat tempor tristique eget vel purus.

Leslie Alexander

March 20, 2023 at 2:37 pm

Phasellus eget fermentum mauris. Suspendisse nec dignissim nulla. Integer non quam commodo, scelerisque felis id, eleifend turpis. Phasellus in nulla quis erat tempor tristique eget vel purus.

Registrasi

Image Structure

Gambar

Struktur Proyek

Linimasa Proyek

Jan 2026
Studi Pendahuluan